Solar for Irish Farms

Solar Panels for Irish Farms

Resolute has spent 15 years engineering solar systems built for the way Irish farms actually work. We handle your TAMS 3 grant application, design around your milking, cooling and pumping loads, and back every install with a 25-year maintenance contract.

Grant Funding

Up to 60% Grant Funding

Irish farms can claim up to €90,000 under TAMS 3 (60% of installation cost) for agricultural solar PV. Farms not eligible for TAMS 3 can access the SEAI Non-Domestic Microgen Grant of up to €162,600. Resolute’s grants advisory team manages the full application, including paperwork, ESB connection, eligibility checks and timeline, so you keep farming while we handle the funding.

€90,000

TAMS 3 Grant

Up to 60% of installation cost. Farmers only. Department of Agriculture.

€162,600

SEAI Non-Domestic Microgen Grant

Open to any business. Used when TAMS 3 not available.

WHY SOLAR FOR IRISH FARMS

Solar That Matches Farm Energy Use

Dairy parlours, milking systems, refrigeration, irrigation pumps, ventilation, grain drying. Irish farms run constant, daytime-heavy electrical loads. That demand profile is almost perfectly matched to what a solar PV system generates. Self-generated power from your roof costs a fraction of grid electricity and protects you from the price volatility that has hit Irish agriculture hard since 2022.

Cut Your Biggest Energy Cost

Irish business electricity averaged €0.23 per kWh in late 2024, well above the EU average. A correctly sized farm PV system replaces the most expensive imported kWh with self-generated electricity. That typically cuts daytime grid imports by 50 to 80% and delivers 4 to 7 year payback once grants are applied.

Power Milking, Cooling and Pumping

Dairy parlours, bulk milk tanks, irrigation pumps, slurry agitators, grain drying fans and ventilation systems all draw heavily during daylight hours. That is exactly when your panels generate. Self-consumption is what makes farm solar economics work, which is why we size systems to match your actual load profile, not your roof area.

Keep Generating after Sunset

Battery storage extends self-consumption into the evening and protects critical loads from grid outages. That is a real concern for dairy, poultry and any farm running cold storage. We design hybrid inverter systems matched to your usage curve and grid export tariff.

Pass Co-op Carbon Audits

Co-ops, processors and major retailers increasingly require carbon-reduction commitments from their supplier farms. A documented PV system with monitoring data is the cleanest way to evidence on-farm emissions reduction in supplier audits and Origin Green submissions.

THE BIFACIAL DIFFERENCE

Bifacial Panels Built for Farm Roofs

Resolute installs bifacial (glass-on-glass) panels exclusively. They generate from both faces, capturing reflected light from sheds, slurry tanks and ground surfaces, for a higher annual yield per kWp than conventional panels. For farm buildings storing fuel, fertiliser, machinery or feed, bifacial panels carry a superior fire-performance rating compared with standard glass-and-backsheet construction. That matters when your insurer asks what is on the roof of a building full of high-value stock.

Trusted Brands
WHY RESOLUTE

Ireland's Leading Solar Engineers

Fifteen years installing across Ireland. Over a hundred years of collective management experience in Irish energy infrastructure. SEAI-certified, the gold standard required by serious commercial and public-sector clients. We deliver from a single Dublin HQ across the Republic of Ireland and Northern Ireland, with dedicated ROI and NI phone lines for both jurisdictions.

A 25-Year Promise No One Else Makes

Every Resolute system comes with the option of a 25-year lifetime maintenance contract, for the full duration of the panel guarantee. No other installer in the Irish market offers this. It means your ROI is protected for the full lifetime of the system, with scheduled maintenance, performance monitoring, inverter checks and component replacement covered. We do not just install. We stay.

15+
Years Installing
100+
Years Collective Experience
25
Year Maintenance Contract
2
Jurisdictions Covered
Client Roster

Trusted by Ireland's Biggest Energy Users

Testimonials

What Our Happy Customers Say About Us

5.0

18 Reviews

OUR PROCESS

Six Steps from Enquiry to Install

From the first phone call to the 25-year maintenance contract, every step is owned by an SEAI-certified Resolute team member.

Step 01

Free Assessment

No-obligation consultation custom for your farm’s energy use, building stock and grant eligibility. Delivered within five business days of enquiry.

Step 02

Site Analysis

Physical roof survey, structural assessment, shading analysis and orientation optimisation. We identify the highest-yield surfaces on your buildings.

Step 03

Design and Engineering

Custom CAD drawings, energy yield modelling and component specification. Every system is engineered for your specific load profile, not pulled from a catalogue.

Step 04

Grant Application

We prepare and submit your TAMS 3 or SEAI Non-Domestic Microgen Grant application end-to-end, including the ESB connection paperwork.

Step 05

Installation and Commissioning

SEAI-certified installation to highest industry standards, with minimal disruption to farm operations and full grid connection.

Step 06

Monitoring and Maintenance

Real-time performance dashboard, scheduled maintenance visits, and lifetime support under the 25-year maintenance contract.

CASE STUDY SPOTLIGHT

Recent Project

Primark Distribution Centre, Newbridge

When the existing roof structure could not take a rooftop array, Resolute designed a custom ground-mounted system on the surrounding land, overcoming structural constraints to deliver the distribution centre with a custom solar solution. The same engineering capability applies to farm sites with unsuitable roof stock or available paddock land.

Ground-Mount
Custom Solution
Aerocompact
Mounting System
Custom Design
For Site Conditions

Typical Farm Solar Returns

Numbers below are sector ranges based on typical Irish commercial yields (850 to 950 kWh per kWp installed per year) and 2024 average business electricity rates of €0.23 per kWh. Your actual savings depend on your load profile, system size and grant eligibility. The free site assessment gives you a project-specific number.

30 kWp Dairy or Mixed Farm

Annual generation25,500 to 28,500 kWh
Annual electricity savings€4,500 to €6,000
CO2 offset per year8 to 10 tonnes per year
Payback periodTypically 4 to 7 years with TAMS 3 grant applied

50 kWp Poultry or Horticulture Site

Annual generationApproximately 42,500 to 47,500 kWh
Annual electricity savings€7,500 to €10,000 depending on self-consumption rate
CO2 offset per yearApproximately 14 to 17 tonnes per year
Payback periodTypically 4 to 6 years with grant funding

30 kWp Dairy or Mixed Farm

Free site assessment delivered within five business days. We handle the grant paperwork.

FARM SOLAR FAQS

Frequently Asked Questions

Usually no. Rooftop installs under 50 square metres or 50% of roof area are exempt. Larger or ground-mounted systems may need planning, which we confirm during the free site survey.

TAMS 3 covers up to 60% of cost to €90,000 for farmers only. SEAI NDMG pays up to €162,600 for any business. We handle whichever applies to you.

Yes. Under the Clean Export Guarantee, Irish suppliers currently pay 19.5c to 20c per kWh. We design for self-consumption first since that displaces 23c per kWh.

Dairy farms typically need 25 to 50 kWp. Poultry and horticulture often justify 50 kWp plus. We size from your half-hourly electricity data, not rules of thumb.

A 30 to 50 kWp install takes 5 to 10 working days. We schedule around milking, parlour use and busy cycles. Most farms see zero downtime.

Yes. Reflected light from sheds and yards adds 5 to 15% yield, and the higher fire rating matters above stored fuel, feed or machinery.

Every system comes with the option of a 25-year maintenance contract covering monitoring, inverter checks and component replacement. You get a live performance dashboard on your phone.

Book Your Free Farm Survey

Five-day turnaround. No obligation. We handle the grant paperwork.

  • SEAI-certified site survey
  • TAMS 3 and SEAI grant application managed end-to-end
  • Custom design for your specific farm load profile
  • Installed and supported by Ireland’s market-leading PV team
  • 25-year lifetime maintenance contract option

Or call us directly.

Request A Quote

Fill out the form below to book a free consultation with one of our Solar & EV Charging Experts.