SEAI Grants + Sports Capital Funding Available

Solar for Sports Centres Ireland

Sports centres and leisure facilities spend thousands on electricity every year. Resolute Engineering Group designs and installs solar PV systems for sports centres across Ireland, helping facility managers cut energy costs and take control of their power supply. SEAI certified, 15+ years in business, and backed by Ireland’s only 25-year maintenance contract.

Grants & Funding

Multiple Funding Routes for Sports Facilities

Sports centres can stack several funding streams: the SEAI Non-Domestic Microgen Grant, the Sports Capital and Equipment Programme, Pobal community grants, Local Authority energy grants, the Accelerated Capital Allowance (100% Year-1 tax write-off), and the Clean Export Guarantee for surplus electricity. Resolute manages the full application process on your behalf.

€162,600

SEAI Non-Domestic Microgen

Up to €162,600 in grant funding for commercial and community solar installations, depending on system size. Open to sports clubs and leisure centres.

SCEP

Sports Capital Programme

Solar PV can be included as part of a broader Sports Capital and Equipment Programme application from the Department of Sport. We advise on integration with your capital plan.

Why Sports Centres Suit Solar

Sports Centres Are Built for Solar

Sports centres are among the most energy-intensive buildings in any community. Between floodlighting, heating, ventilation, pool filtration and hot water systems, electricity demand runs high from early morning through to late evening. Most facilities also have large, flat or low-pitch roof areas with minimal shading. That combination of high daytime demand and ample roof space makes them ideal candidates for solar PV.

Lower Running Costs

Solar panels generate electricity from daylight, directly offsetting your grid consumption. Over the life of the system, this translates into substantial savings on energy bills.

Energy Independence

Generating your own power reduces your exposure to rising electricity prices and gives your facility greater control over its energy supply for 25 years or more.

Reinvest Savings in Facilities

Every euro saved on electricity is a euro that can be reinvested into pitch maintenance, equipment upgrades, coaching programmes or facility improvements.

Attract Eco-Conscious Members & Sponsors

A visible commitment to renewable energy strengthens your reputation in the community and appeals to members and sponsors who value sustainability.

The Resolute Product Difference

Bifacial Panels, Designed Around Your Energy Profile

Sports centres have a unique energy profile that standard commercial solar designs do not always account for. Facilities with swimming pools, ice rinks or large multi-use halls have demand that shifts throughout the day and week. Pool filtration, HVAC and floodlighting all have different demand curves, and system sizing must reflect that.

Resolute installs bifacial glass-on-glass panels exclusively, sourced from AE Solar and Longi. They generate from both faces for higher annual yield per kWp, and carry a superior fire-performance rating. Where roof space is limited, carport-mounted arrays over car parks or ground-mounted systems on adjacent land offer effective alternatives.

Trusted Brands
Engineering Credentials

Ireland's Leading Solar Engineers

Fifteen years installing across Ireland. Over a hundred years of collective management experience in Irish energy infrastructure. SEAI-certified, with delivered sports projects including Naas Sport Centre, Celbridge Park Sports Facility, St. Conleth’s Park (Kildare GAA) and Naomh Mearnóg GAA Club, alongside commercial installs for Meta, Primark and Domino’s.

25-Year Lifetime Maintenance

Every Resolute system comes with the option of a 25-year maintenance contract. No other installer in the Irish market offers this. Scheduled maintenance, performance monitoring, inverter checks and component replacement covered for the full panel guarantee.

15+
Years Installing
100+
Years Collective Experience
25
Year Maintenance Contract
2
Jurisdictions Covered
Client Roster

Trusted by Ireland's Biggest Energy Users

Testimonials

What Our Customers Say

5.0

18 Reviews

How We Work

Six Steps from Enquiry to Install

From the first phone call to the 25-year maintenance contract, every step is owned by an SEAI-certified Resolute team member. We schedule all work to minimise disruption to your facility’s programme.

Step 01

Free Assessment

No-obligation initial consultation tailored to your sports centre, facility type and funding eligibility. We come to you.

Step 02

Site Survey & Energy Audit

We assess your facility’s roof space, orientation, structural condition and energy consumption patterns to determine the right system size and configuration.

Step 03

Custom System Design

Our engineering team designs a bespoke solar PV system tailored to your facility. This includes panel layout, inverter selection and battery storage options where appropriate.

Step 04

Grant Application

Resolute manages the full SEAI grant process on your behalf, and advises on Sports Capital, Pobal and Local Authority funding where applicable.

Step 05

Installation

SEAI-certified installers schedule all work to minimise disruption to your programme. Tie-ins and heavy work are completed outside peak hours where possible.

Step 06

Monitoring & Ongoing Support

Once commissioned, we set up real-time performance monitoring and hand over full documentation. Ongoing maintenance covered under the optional 25-year contract.

Case Study

A Real Resolute Sports Centre Install

Naas Sport Centre

Resolute designed and installed a solar PV system at Naas Sport Centre, engineered around the facility’s mixed-use energy demand across pool filtration, floodlighting, HVAC and hot water systems. All installation work was scheduled around the centre’s programme to avoid disruption to members and bookings.

Ground-Mount
Custom Solution
Aerocompact
Mounting System
Custom Design
For Site Conditions

Typical Sports Centre Solar Returns

Figures below are modelled for two indicative system sizes using Irish commercial yield ranges (850 to 950 kWh per kWp per year) and the 2024 average business electricity rate of €0.23 per kWh. Actual performance varies with facility type, load profile and funding stack.

50 kWp Community Sports Centre

Mid-size GAA club or leisure facility

Annual generation42,500 to 47,500 kWh
Annual electricity savings€9,770 to €10,920
CO2 offset per year13 to 14 tonnes
System lifespan4 to 6 years (post-grant)

200 kWp Large Leisure Facility

Pool, gym and multi-use site

Annual generation170,000 to 190,000 kWh
Annual electricity savings€39,100 to €43,700
CO2 offset per year50 to 56 tonnes
System lifespan4 to 5 years (post-grant)

Get a facility-specific number

Free site assessment from an SEAI-certified surveyor. We handle the grant paperwork.

Common Questions

Frequently Asked Questions

Most commercial rooftop installations do not require planning permission in Ireland, subject to certain conditions. We confirm this during the design stage and manage the process if permission is needed.

Timelines depend on system size and site conditions. A typical installation takes a few weeks from design sign-off to commissioning, with work scheduled around your facility’s programme.

The SEAI Non-Domestic Microgen Grant, Sports Capital and Equipment Programme, Pobal grants and Local Authority grants may all apply. Eligibility depends on your organisation type and location. We confirm during the site survey.

This depends on your energy usage and system size. Solar will significantly reduce your grid dependence, and battery storage can extend coverage further. We confirm projected output after a site survey.

Yes. Flat roofs are well suited to solar PV. Panels are mounted on angled frames to optimise generation, without penetrating the roof membrane in most cases.

Our panels carry product warranties of 25 years or more. With Resolute’s 25-year lifetime maintenance contract, your system is monitored and maintained for the full guarantee period.

Scheduled maintenance visits, real-time performance monitoring, inverter health checks, component replacement, and full lifetime support for the entire 25-year panel guarantee. No other installer in the Irish market offers this.

Yes. Resolute operates across the Republic of Ireland and Northern Ireland from our Dublin headquarters. We have a dedicated NI line: +44 28 3073 1007.

Get Started with Solar for Your Sports Centre

Your facility’s roof has the space, the orientation and the potential to generate serious energy savings.

With SEAI grants, Sports Capital funding and a properly sized system from an SEAI-certified installer, solar PV is one of the most practical investments your sports centre can make.

  • SEAI-certified site survey
  • TAMS 3 and SEAI grant application managed end-to-end
  • Custom design for your specific farm load profile
  • Installed and supported by Ireland’s market-leading PV team
  • 25-year lifetime maintenance contract option

Or call us directly.

Request A Quote

Fill out the form below to book a free consultation with one of our Solar & EV Charging Experts.